|
Issue |
Title |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
ANALISA KAPASITAS PENGGUNAAN GENERATOR TURBIN 800 KW TERHADAP PEMAKAIAN BEBAN DI PTPN IV UNIT PKS BERANGIR |
Abstract
PDF_Vol.13 No.2 (2024)_19366
|
Wahyu Ramadhoni, Faisal Irsan Pasaribu, budhi santri kusuma, Elvy Sahnur Nasution, Rimbawati Rimbawati, Noorly Evalina, Arfis Amiruddin |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
ANALISA KERUSAKAN PADA MESIN PRESS EXPELLER PADA STASIUN PENGOLAHAN DENGAN METODE FAULT TREE ANALYSIS (FTA) DI PERKEBUNAN NUSANTARA III (PERSERO) PKO SEI MANGKEI |
Abstract
PDF_Vol.13 No.1 (2024)_16449
|
Sri Meutia, Azzam Ghufron Nasution |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
Analisa Sistem Antrian Loket Pembayaran (Kasir) pada CV Toko Happy Srigunting Swalayan dengan Menggunakan Sofware Arena |
Abstract
PDF_Vol.13 No.1 (2024)_16318
|
Muhammad Azizi, Budhi Santri Kusuma, Yudi Daeng Polewangi |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
ANALISIS EFISIENSI PRODUKSI TAHU DENGAN METODE LINE BALANCING PADA PABRIK TAHU & TEMPE OKTA GELELUNGI KABUPATEN ACEH TENGAH |
Abstract
PDF_Vol.13 No.2 (2024)_18400
|
Charles Katunggung, Muhammad Zakaria, Syarifuddin Syarifuddin, Meutia Fadilla |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
ANALISIS PENGARUH VOLUME LIMBAH CAIR PABRIK KELAPA SAWIT TERHADAP TOTAL SUSPENDED SOLID (TSS) MENGGUNAKAN METODE HYDRAULIC RETENTION TIME (HRT) DI PMKS PT.SISIRAU |
Abstract
PDF_Vol.13 No.1 (2024)_19125
|
Khairul Anshar, Evisa Amanda |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
ANALISIS PENGENDALIAN KUALITAS MINYAK GORENG (OLEIN) MENGGUNAKAN STATICAL QUALITY CONTROL (SQC) DI PT. INDUSTRI NABATI LESTARI |
Abstract
PDF_Vol.13 No.1 (2024)_17324
|
Sri Meutia, Tresnawan Maulana, Amri Amri, Syamsul Bahri |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
ANALISIS POSTUR PEKERJA PEMBUATAN PAVING BLOCK DI UD. GAJAH TRASO MENGGUNAKAN METODE RAPID UPPER LIMB ASSESSMENT (RULA) SEBAGAI UPAYA MENGURANGI KELUHAN MUSCULOSKELETAL DISORDER |
Abstract
PDF_Vol.13 No.2 (2024)_19144
|
Cut Fitriani, Muhammad Sayuti, Cut Ita Erliana |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
ANALISIS PROSES KERJA PENYIMPANAN DAN PENGELUARAN SPARE PART DI PT. X |
Abstract
PDF_Vol.13 No.1 (2024)_19252
|
MALIKA KHAIRIAH, KHAIRUL ANSHAR |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
Penentuan Harga Pokok Produksi Tempe Berdasarkan Metode Full Costing Pada UD. MS |
Abstract
PDF_Vol.13 No.2 (2024)_19429
|
Fatimah Fatimah, Subhan A. Gani, Nurlativah Hanum Tinendung |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
PENERAPAN METODE MOOSRA DAN PEMBOBOTAN RANK ORDER CENTROID (ROC) DALAM PEMILIHAN MARKETPLACE TERBAIK |
Abstract
PDF_Vol.13 No.2 (2024)_18487
|
Jannah Safitri, Muhammad Zakaria, Syarifah Akmal |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
Penerapan Metode OEE dan FMEA Dalam Mengukur Kinerja Mesin Auto Cutter Untuk Meminimalisir Six Big Losses di PT. XYZ |
Abstract
PDF_Vol.13 No.2 (2024)_17332
|
Syukriah Syukriah, Khairul Anshar, Muhammad Rifki Alkhairi |
|
Vol 13, No 2 (2024): Industrial Engineering Journal (IEJ) - Oktober 2024 |
PENGENDALIAN RISIKO KECELAKAAN KERJA DENGAN MENGGUNAKAN METODE HAZARD IDENTIFICATION RISK ASSESSMENT AND RISK CONTROL (HIRARCH) PADA AREA PRODUKSI DI UD BIHUN BAPAK ZULKIFLI KABUPATEN BIREUN |
Abstract
PDF_Vol.13 No.2 (2024)_17642
|
Syukriah Syukriah, Syamsul Bahri, Andini Mutiara Pratiwi Saragih |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
PENILAIAN POSTUR KERJA GUNA EVALUASI TINGKAT RESIKO KERJA PADA OPERATOR LOADER DENGAN METODE RECOMMENDED WEIGHT LIMIT (RWL) DI PT. XYZ |
Abstract
PDF_VOL.13 NO.1 (2024)_16613
|
yusril yahya siagian, Cut Ita Erliana, Khairul Anshar |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING DAN ALGORITMA BLOCPLAN PADA PT. ABAD JAYA ABADI SENTOSA |
Abstract
PDF_Vol.13 No.1 (2024)_17712
|
Yohana Dian Putri, Juliana Juliana |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
PERENCANAAN DAN PENGENDALIAN PRODUKSI ROTI DENGAN MENGGUNAKAN METODE AGGREGATE PLANNING HEURISTIK DI UD. XYZ |
Abstract
PDF_VOL.13 NO.1 (2024)_16210
|
Trisna Trisna, Syarifah Akmal, Frendy Darmansyah |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
Perencanaan Produksi Brown Sugar dengan Metode Single Moving Average, Weight Moving Average dan Single Exponential Smoothing |
Abstract
PDF_Vol.13 No.1 (2024)_16750
|
Syarifah Akmal, Subhan A. Gani, Supriatin Supriatin |
|
Vol 13, No 1 (2024): Industrial Engineering Journal (IEJ) - April 2024 |
Strategi Pengembangan usaha penyulingan minyak pala UD.Saiful Rizal di Aceh Barat Daya dengan menggunakan metode SWOT |
Abstract
PDF_Vol.13 No.1 (2024)_18158
|
Nur Khalis Abdullah, Syarifah Akmal, Syamsul Bahri |
|
1 - 17 of 17 Items |
|