Study Coordination Design of Over Current Relay on The Kiln Area Electrical System

Raihan Putri, Endri Juliadi, Misbahul Jannah, D. R. Ramji, Waleed Khalid Ahmed Al-Ani

Abstract


PT. Semen Padang is one of the largest cement producers in western Indonesia, along with the development of the cement industry PT. Semen Padang added a new Indarung VI factory to support the production process to meet market demand. With the addition of this new factory, a good safety design is needed in the design of the electrical system so that production continuity is not disturbed and reliability values are high. Therefore, over-current protection coordination studies are needed on the electrical system of the kiln area at Trafo 2 Indarung VI PT. Semen Padang to get a safe and reliable system. In the final task, this time will be done modeling, simulation of load flow and short circuit, calculation of relay settings, and simulation of coordination of overcurrent protection phase interference in the electrical system kiln area in Transformer 2 Factory Indarung VI PT. Semen Padang. The plot results of the coordination of the time flow curve obtained through the results of analysis and manual calculations recommended tuning pick-up overcurrent relayand grading time overcurrent relaytuning phase interference. Grading time between overcurrent relay is coordinated by 0.2 seconds. With the protection coordination setting, the electrical system of the kiln area at the Indarung VI factory PT. Semen Padang is safer and more reliable.


Keywords


interference; coordination of protection; overcurrent relayphase disorders;

Full Text:

PDF

References


Anon. n.d. “PT Semen Padang Bangun Pabrik Keenam - Bisnis Tempo.Co.” Retrieved September 9, 2021 (https://bisnis.tempo.co/read/580544/pt-semen-padang-bangun-pabrik-keenam).

B. de Metz-Noblat, F. Dumas, and C. Poulain. 2011. “Cahier Technique No.158 Calculation of Short-Circuit Currents.” Schneider Electric 19(83):1–13.

Brand, Klaus Peter, and Ivan De Mesmaeker. 2013. Power System Protection.

Electric, Schneider. n.d. “MiCOM P34x & P391.”

IEEE Std 242. 2001. IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. Vol. 2001.

Industri, Fakultas Teknologi. 2016. “Studi Perencanaan Koordinasi Proteksi Arus Lebih Pada Sistem Kelistrikan Pt . Semen Indonesia Pabrik Aceh Study Of Planning Overcurrent Protection Coordination At Electrical System PT . SEMEN.”

ISO 527-2. 2003. “International Standard International Standard.” 61010-1 © Iec:2001 2003:13.

Mahindhara, Vincentius Raki, Margo Pujiantara, and Ardyono Priyadi. 2015. “Algorithm Pada Sistem Kelistrikan PT . Pupuk.” 5(2).

Ninla Elmawati Falabiba. 2019. 済無 No Title No Title No Title.

Setiawati, Margo Pujiantara, Sjamsjul AnamArus, and P T.Petrokimia. 2016. “Koordinasi Proteksi Directional Overcurrent Relay Dengan Mempertimbangkan Gangguan.” 5(2):B437–42.

Sinaga, P. 2016. “Evaluasi Koordinasi Sistem Proteksi Pada Sistem Kelistrikan PT. Semen Padang (Persero) Tbk Akibat Adanya Penambahan Pabrik Baru Indarung VI.”

Tjahjono, Anang, Dimas O. Anggriawan, Alfa K. Faizin, Ardyono Priyadi, Margo Pujiantara, Taufik Taufik, and Mauridhi Hery Purnomo. 2017. “Adaptive Modified Firefly Algorithm for Optimal Coordination of Overcurrent Relays.” IET Generation, Transmission and Distribution 11(10):2575–85. doi: 10.1049/iet-gtd.2016.1563.




DOI: https://doi.org/10.29103/jreece.v1i2.5570

Article Metrics

 Abstract Views : 695 times
 PDF Downloaded : 103 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Raihan Putri1, Endri Juliadi, Misbahul Jannah, D. R. Ramji, Waleed Khalid Ahmed Al-Ani

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.