Analysis of Age Transformer Due to Annual Load Growth in 20 kV Distribution Network
Abstract
Distribution transformer is a component in distributing electricity from distribution substations to consumers. Damage to distribution transformers causes continuity of customer service to be disrupted (power cut or blackout occurs). The length of the PLN electricity network requires a transformer to distribute electricity to serve consumers and how to maintain the transformer. The daily load curve of a peak load for housing, shops and factories / industries varies. Load served 200 kVA distribution transformer cannot serve the load on housing, shops and factories / industry. The method used is the replacement of a distribution transformer with a capacity of one stage greater or the replacement of a distribution transformer with a capacity of two levels larger. The distribution transformer carried out by the research is a capacity of 200 kVA replaced by 250 kVA. The ability of a distribution transformer cannot accommodate a load which will increase as an area is advanced. Observations made by calculating the age of the transformer by assuming the annual load growth (r) = 3% = 0.3. Annual peak load (P) = 1.8 p, u increase in oil temperature at peak load (θo = 96.21 0C; 84.16 0C). The increase in the hottest temperature above the oil cover, the increase in the temperature of the hottest place above the oil (θg = 20 0C; 20 0C). The ratio of the load loss to the nominal load excitation loss (Q = 3; 30). By assuming the values of these methods it can be estimated that the life of a distribution transformer is 20 kV, a capacity of 200 kVA is 18 years.
Keywords
Full Text:
PDFReferences
Junaidi, Weriono, Roza, I, S. H. (2018). Economic Planning Analysis of MHP PLTMH Using Pico-hydro Turbine: Hundreds of watts - 5 KW. IJISRT (International Journal of Innovative Science and Research Technology), 3(2), 112–116. Retrieved from Anlalisis, Planning Ekonimis PLTMH, Pico-Hydro Turbine, 5 kW.
Junaidi, Weriono, Roza, I. (2018). Irrigation Water Debit Analysis that will be used on Micro Power Plant in SEI . Rampah Sub-District of Serdang Bedagai Regency. International Journal of Innovative Science and Research Technology (IJISRT), 3(1). Retrieved from http://ijisrt.com/irrigation-water-debit-analysis-that-will-be-used-on-micro-power-plant-in-sei-rampah-sub-district-of-serdang-bedagai-regency
Roza, I. (2018). Analisis Tegangan Jatuh Lokasi Penempatan Trafo Distribusi 20 kV Untuk Penyaluran Energi. Journal of Electrical and System Control Engineering, 1(2), 72–82. Retrieved from http://ojs.uma.ac.id/index.php/jesce
Roza, I. (2019). Analisa Perbaikan Drop Voltage Dengan Trafo Sisip Sistem Distribusi Jtr Di PT. PLN (Persero) Rayon Perbaungan Dengan Aplikasi Program ETAP. 133–135. MEDAN.
Roza, I., Nasution, A. A., Setiawan, H. (2019). Analisis Umur Minyak Terhadap Temperatur Transformator 150kv Akibat Penurunan Tegangan Tembus Pada Pembangkit Listrik Tenaga Gas (PLTG) 2.1 PT PLN (Persero) Unit Pelaksana Pembangkitan Belawan. JESCE (Journal of Electrical and System Control Engineering), 3(1), 1–12. Retrieved from http://ojs.uma.ac.id/index.php/jesce
Sitanggang, M. (2009). Study Perkiraan Umur Trasfomator Distribusi Dengan Metode Tingkat Tahunan. In Skripsi (pp. 1–47). Medan: Program Studi Teknik Elektro USU.
Yani, A., Junaidi, Irwanto, M., & Haziah, A. H. (2019). Optimum reactive power to improve power factor in industry using genetic algortihm. Indonesian Journal of Electrical Engineering and Computer Science, 14(2), 751–757. https://doi.org/10.11591/ijeecs.v14.i2.pp751-757
DOI: https://doi.org/10.29103/jreece.v1i1.3685
Article Metrics
Abstract Views : 429 timesPDF Downloaded : 83 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Indra Indra Roza, Yussa Ananda, Lisa Adriana Siregar, Dharmawati, Junaidi
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.