Economic Dispatch Analysis Using Equal Incremental Cost Method with Linear Regression Approach
Abstract
Keywords
Full Text:
PDFReferences
Dewangan, S. K., Jain, A. and Huddar, A. P. (2015) ‘Comparison of Particle Swarm Optimization with Lambda Iteration Method to Solve the Economic Load Dispatch Problem’, pp. 1900–1907.
Dike, D. O., Adinfono, M. I. and Ogu, G. (2013) ‘Economic Dispatch of Generated Power Using Modified Lambda- Iteration Method’, 7(1), pp. 49–54.
Hakimah, Y. (2016) ‘Penjadwalan Operasi Pembangkit Pltg Gunung Megang Berdasarkan Biaya Bahan Bakar’, 4, pp. 31–43.
Hasibuan, A. (no date) ‘Menentukan pengoperasian ekonomis pada pembangkit listrik tenaga uap’, (1), pp. 2–6.
Iskandar, I. (2016) ‘Pembagian Beban Secara Ekonomis Pada Pembangkit Thermal Menggunakan Cuckoo Optimization Algorithm’, pp. 507–514.
Kristianto, D., Suyono, H. and Wijono (2014) ‘Operasi Ekonomis Pembangkit Tenaga Listrik dengan Metode Iterasi Lambda Meggunakan Komputasi Paralel’, student jurnal UB, pp. 1–6.
Mariang, Y. (no date) ‘Optimalisasi Penjadwalan Pembangkit Listrik di Sistem Sorong’, pp. 2–7.
Marsudi, D. (2006) Operasi Sistem Tenaga Listrik. Pertama. Yogyakarta.
Nabila, H. (2017) Analisis Economic Dispatch Pada Pltu Sektor Bukit Asam Menggunakan Metode Iterasi Lambda Dan Dynamic Programming, skripsi.
Pertiwi, N. P., Syahrizal and Siregar, R. H. (2018) ‘Analisa Economic Dispatch Pada Unit Pembangkit Menggunakan Metode Iterasi Lambda Berdasarkan Base Point And Participation Factors’, 3(2), pp. 24–29.
Pramudia, D., Hardiansyah and Junaidi (no date) ‘Penyelesaian Economic Dispatch Pada Unit Unit Pembangkit Thermal Dengan Menggunakan Artificial Bee Colony (Abc) Algorithm’.
Rusilawati, Penangsang, O. and Soeprijanto, A. (no date) ‘Implementasi Metoda Taguchi Untuk Economic Dispatch Pada Sistem IEEE 26 BUS’, pp. 1–9.
Suman, M. et al. (2016) ‘Solution of Economic Load Dispatch problem in Power System using Lambda Iteration and Back Propagation Neural Network Methods’, 8(2), pp. 347–355. doi: 10.15676/ijeei.2016.8.2.8.
Syafii and Monice (no date) ‘Operasi Ekonomis (Economic Dispatch) Pembangkit Listrik Tenaga Sampah (PLTSa) dan (PLTG) Dalam Melayani Beban Puncak’, pp. 35–39.
Syah, K. et al. (2012) ‘Analisis Perbandingan Economic Dispatch Pembangkit Menggunakan Metode Lagrange dan CFPSO’, Jurnal EECCIS, 6(1), pp. 91–96.
Takeang, C. and Aurasopon, A. (2019) ‘Multiple of Hybrid Lambda Iteration and Simulated Annealing Algorithm to Solve Economic Dispatch Problem with Ramp Rate Limit and Prohibited Operating Zones’, Journal of Electrical Engineering & Technology. Springer Singapore, 14(1), pp. 111–120. doi: 10.1007/s42835-018-00001-z.
Wood, A. J. and Wollenberg, B. F. (1996) Power generation Operation and Control. Third Edit. Jhon Wiley & Sons, Inc.
Yuliara, I. M. (2016) ‘Regresi Linier Sederhana’, Fisika, pp. 7–41.
DOI: https://doi.org/10.29103/jreece.v1i1.3617
Article Metrics
Abstract Views : 590 timesPDF Downloaded : 363 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Arnawan Hasibuan, Robi Kurniawan, Muzamir Isa, Waleed Khalid Ahmed Al-Ani
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.